Construction Progress

 

A pool and hot tub with striking downtown views were built on the roof (above and below).

 


 

A parking garage was built on the North side of The Kirby at Elm and Akard with direct access to the building (above).

 

36.gif (186012 bytes)      

Renovation began in March 1998 to convert the building into lofts and apartments (above left).  Original marble in the hallways was preserved and polished (above right).

 

Self-contained, locking storage  units were built in the basement (above).



| Photos | | Interior Photos | | Views | | Construction | | Grand Reopening |

 

AMENITIESFLOORPLANSLOCATIONHISTORYFAQMAILING LISTINFORMATIONHOME
        PAGE